Summary: There can be A LOT of procedures -- currently we log two lines (started/done) for each one, when doing call graph scheduling. This leads to ridiculously long log files. Switch to only log these messages in the log file and only if we are verbose logging. Reviewed By: jvillard Differential Revision: D15413330 fbshipit-source-id: 6e26693e8master
parent
64dea4dc0f
commit
d9853aa53d
Loading…
Reference in new issue